The Tech Ed Addition has seen a lot of great progress inside with the above ceiling rough ins being completed and now we move onto painting and ceilings.
Find the latest construction news by visiting: https://www.nicolet.us/o/nhs/p...
SEP 12, 2023
The Tech Ed Addition has seen a lot of great progress inside with the above ceiling rough ins being completed and now we move onto painting and ceilings.
Find the latest construction news by visiting: https://www.nicolet.us/o/nhs/p...