nicolet union high school facilities project graphic

Beginning Monday, June 12th, there will be limited portions of the building open and accessible. ALL students and visitors entering the building will need to park in the Southeast parking lot (with an overflow area into the Eastern portion of the student lot to the North) and proceed down the new concrete pathway on the South side of the building. The ONLY open entrance/exit for the building from June 12th - mid August will be Door #9, located to the West of the Library.  This entrance will be used for all visitors, summer school, and rec participants.

Once inside the building, all offices that are open in the summer will be temporarily relocated to the D Wing hallway . There will be one hallway open for students and visitors to access the A Wing area of the building (gyms, weightroom, etc.). (Map below)

Please note that the entire front circle drive and turnaround will be closed for the summer with barricades installed. The Athletic entrance and driveway will also be closed and be designated as a "construction area" with no public access.

It is anticipated that this setup will remain until mid August when these offices will transition back into the main part of the building and as additional entrances to the building are reopened.

Click here for other construction updates